• calabast@lemm.ee
    link
    fedilink
    English
    arrow-up
    47
    arrow-down
    2
    ·
    7 months ago

    Orange Charger bills landlords based on energy usage instead of the number of outlets installed. So far, the company has installed about 2,000 units nationwide.

    “You have no downside to install 50 outlets day one,” Johnson said. “We only charge when the device is used.”

    But it also says the chargers cost $600 or $750, plus more for installation. Do they charge for both? Either way, I guess it’s the apartment owner’s choice, but god damn I am sick of everyone trying to get a subscription or on-going payment out of me.

    • credo@lemmy.world
      link
      fedilink
      English
      arrow-up
      29
      ·
      7 months ago

      This doesn’t sound like a subscription, so much as consumption based billing. They make their money back by cornering the building-level market (perhaps landlords can put in competing chargers?) and charging a higher charging fee… okay that’s confusing. Charging a higher “fillup” fee.

    • catloaf@lemm.ee
      link
      fedilink
      English
      arrow-up
      12
      ·
      7 months ago

      Is that what they’re doing differently? Because I live in an apartment, and like most people in my city, parking is street parking. This isn’t exciting, it’s just a regular charger with a modified installation cost. Even for people with driveways, the issue isn’t what kind of charger, the issue is that the landlord has no motivation to make an improvement like this.

      • BearOfaTime@lemm.ee
        link
        fedilink
        English
        arrow-up
        4
        arrow-down
        6
        ·
        7 months ago

        Also, many, many, many apartments buildings aren’t built to handle such electrical loads (I’d bet loads of money most aren’t capable - why would you engineer a building for more than it’s projected to need? That just costs more).

        In every apartment and rental house I’ve been in, you’d have to install a new service to be able to charge anything, because they’re already running close to max current capacity.

        What’s that charger going to pull, in amps, for how long? It’ll need to be 220v, at least, and those are dedicated runs (think electric dryer or electric stove).

        • KairuByte@lemmy.dbzer0.com
          link
          fedilink
          English
          arrow-up
          1
          ·
          7 months ago

          You realize virtually every American building with electricity has 220v? It’s not some mystical thing only some people have stumbled upon. All it would take to install it is running cable… which is what needs to happen anyway. Not only are they being placed where you’re not likely to have existing lines, you wouldn’t want to use existing line since you wouldn’t want these on a shared breaker to begin with.

        • toofpic@lemmy.world
          link
          fedilink
          English
          arrow-up
          1
          arrow-down
          2
          ·
          7 months ago

          I have no idea why you are being downvoted, you’re just stating facts