“But even in the only country that is massively building, China, nuclear development is comparatively marginal. In 2023, China started up one new nuclear reactor, that is plus 1 GW, and more than 200 GW of solar alone. Solar generated 40% more power than nuclear and all non-hydro renewables—mainly wind, solar, and biomass—generated four times as much as nuclear.”
The report also highlights how nuclear power is being challenged not only by the strong growth of solar and wind, but also by battery storage, whose costs are projected to decline below those of coal-fired and nuclear power plants by around 2025 in China. “Solar plus storage is already significantly lower than nuclear power in most markets today, as well as highly competitive with other low-emissions sources of electricity that are commercially available today,” it also notes.
The authors also cite data from investment bank Lazard revealing that solar-plus-storage can already be cheaper than gas peaking and new nuclear. “The competitive cost and large-scale availability of variable renewable energy sources combined with firming options—especially storage—could well turn out to be the game-changer of energy policy in the years to come,” they further explain.

  • dgmib@lemmy.world
    link
    fedilink
    English
    arrow-up
    13
    arrow-down
    3
    ·
    3 months ago

    Such an incredibly misleading article.

    1 GW of nuclear capacity generates several times more electricity than 1 GW of PV capacity.

    Nuclear power plants run at almost full capacity pretty much 24/7/365. With the occasional shutdown every few years for maintenance and to replace the fuel rods.

    PVs only generate electricity during the day, and only hit their maximum capacity under ideal conditions. The average output of PVs is 15-25% of their capacity.

    Globally we generate more electricity from nuclear than we do from all PVs together.

    At the typical sizes we’re building them you need dozens of PV farms to match the energy output of a single nuclear reactor.

    • eleitl@lemm.ee
      link
      fedilink
      English
      arrow-up
      4
      ·
      3 months ago

      My capacity factor is something like 11%. Need to recompute it, using latest data.