• TechNerdWizard42@lemmy.world
    link
    fedilink
    arrow-up
    64
    arrow-down
    3
    ·
    9 months ago

    The bridge is basically valueless compared to everything else about the ship and cargo plus the lawsuits from various contract breaches and other damages. Port shutdowns, environmental cleanup, insurance losses. $100m is a rounding error.

    • Madison420@lemmy.world
      link
      fedilink
      arrow-up
      22
      arrow-down
      1
      ·
      9 months ago

      It’s cost is both material and in the business of links from one side to the other. It’s almost certainly worth multi billions at this point.