A portion of the Francis Scott Key Bridge in Baltimore has collapsed after a large boat collided with it early on Tuesday morning, sending multiple vehicles into the water.

At about 1.30am, a vessel crashed into the bridge, catching fire before sinking and causing multiple vehicles to fall into the water below, according to a video posted on X.

“All lanes closed both directions for incident on I-695 Key Bridge. Traffic is being detoured,” the Maryland Transportation Authority posted on X.

Matthew West, a petty officer first class for the coastguard in Baltimore, told the New York Times that the coastguard received a report of an impact at 1.27am ET. West said the Dali, a 948ft (29 metres) Singapore-flagged cargo ship, had hit the bridge, which is part of Interstate 695.

    • francisfordpoopola@lemmy.world
      link
      fedilink
      English
      arrow-up
      25
      arrow-down
      2
      ·
      9 months ago

      That’s a crime scene and a death scene. It’s not going to go quickly. The good news is that it’s a critical roadway and waterway intersection so the feds and state government have motivation to make haste.

      • fishos@lemmy.world
        link
        fedilink
        English
        arrow-up
        18
        arrow-down
        1
        ·
        9 months ago

        Except there is no mystery as to the deaths part. Investigations take a lot of time when there are a lot of questions. The only question here is “why did the boat plow straight into the bridge?”. There’s very little question how/why the bridge collapsed(it got hit directly by a massive cargo ship). No one’s going to question the physics of it. The only question will be “was it captain error or ship error so we know who to fine”. Recovering the ship will be part of answering that and the rest will be communication and maintenance logs.

    • Treczoks@lemmy.world
      link
      fedilink
      arrow-up
      7
      ·
      9 months ago

      Good luck finding the necessary crane capacity. There are a handful of seriously big cranes in the 7000 tons plus range, but they are Dutch or Japanese, primarily. Wherever they are, they are probably busy and will take ages to get there. While the weight/mass of the bridge is not available online, it surely exceeds the weight limits of cranes currently in existence by far, so the bridge segments need to be cut up prior to removal.

      Even if the US spends insane amounts of money, this issue will take quite some time to resolve.

        • Treczoks@lemmy.world
          link
          fedilink
          arrow-up
          1
          ·
          9 months ago

          At a 1,600 tons limit, one would have to cut the debris into a lot of small pieces. There is no info on the net on how much mass the Key bridge had, but assuming the build and the size, half a million tons is probably not to far off.

          • Tug@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            9 months ago

            It won’t come out in one piece, but it can come out in much larger pieces with a big crane. This one specifically was used to build bridges and put in far larger sections than this job would require. Smaller crane barges will work on the smaller pieces simultaneously. They’ll clear half the channel (most likely the section away from the Dali) and open it to one-way traffic while they continue clean up.