First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

    • Yendor@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      0
      arrow-down
      1
      ·
      1 year ago

      The reduced operating emissions take 10+ years to outweigh the enormous construction emissions of nuclear. (Compared to gas.)

  • doggle@lemmy.world
    link
    fedilink
    English
    arrow-up
    0
    ·
    1 year ago

    Oh, neat. My state did something not completely stupid. I’ve got some reservations about nuke power as opposed to renewable, but this is definitely better than continuing fossil fuels.

    • killa44@lemmy.world
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 year ago

      Fission and fusion reactors are really more like in-between renewable and non-renewable. Sure, it relies on materials that are finite, but there is way, way more of that material available in comparison to how much we need.

      Making this distinction is necessary to un-spook people who have gone along with the panic induced by bad media and lazy engineering of the past.

        • Ryumast3r@lemmy.world
          link
          fedilink
          English
          arrow-up
          0
          ·
          1 year ago

          I’m spooked by the fact that you have no idea how the US enriches uranium, or the difference between a power pressurized water reactor and a fast “breeder” reactor (if you were thinking of plutonium) or a centrifuge.

          The US enriches uranium using a gas-centrifuge. The US also no longer recycles spent nuclear fuel, but France does.

  • Yendor@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    0
    arrow-down
    1
    ·
    1 year ago

    Ah, i remember studying the Westinghouse AP1000 reactor design when I was at Uni. It had just been approved, and numerous plants were expected, with the first expected to be online from around 2010.

    It’s 2023, and this is the first one to go live in the US.